GRADING & STANDARDS

90/100 gets you to the line. The finished project still has to make sense in the real world.

FabChallenge is graded as a complete fabricated product. The score matters, but a project also has to pass four practical yes-or-no questions: is it safe, installable, powder-coat ready, and saleable?

THE PASSING STANDARD

90 out of 100—and no hiding a major problem behind a pretty weld.

The rubric looks at the complete job: dimensions, fit-up, welds, distortion, cleanup, finish preparation, and overall workmanship. A high numerical score does not make an unsafe or unusable product acceptable.

“We are not here to fail people. We hope to see some beautiful products come back, because that means people took the time to learn and the way we taught it was effective.”

— Adam Stanfill Creator of FabChallenge
PASS90/100
FOUR QUESTIONS THAT MATTER

Before the score means anything, the product has to be acceptable.

These are deliberately simple because they mirror the kind of judgment a fabricator has to make before work leaves the shop.

01

Is it safe?

No dangerous edges, obvious hazards, or workmanship that makes the finished piece unsafe to handle or use.

02

Can it be installed?

The assembly has to sit, align, and function like the drawing intended—not merely look close from across the room.

03

Would someone pay for it?

The overall workmanship has to be something a reasonable customer could accept as a finished fabrication product.

04

Is it powder-coat ready?

Cleanup, surface condition, and finishing details must be ready for the next professional step.

THE RUBRIC LOOKS AT THE WHOLE JOB

Good fabrication is a chain of decisions.

The participant packet remains the authority for exact scoring. This page explains the categories in normal shop language.

Drawing compliance

Dimensions, orientation, features, overall height, and geometry.

Fit-up & alignment

Squareness, gaps, component position, baseplates, and how the assembly actually sits.

Weld workmanship

Required joints complete, safe, consistent, and appropriate for the finished piece.

Distortion control

Heat and sequence did not pull the assembly so far out of shape that the job is compromised.

Cleanup & finish prep

Burrs, spatter, grinder damage, sharp edges, contamination, and surface readiness.

Customer readiness

The final gut-check: would this be acceptable work to hand over?

AFTER THE SCORE

The project does not disappear into a grading room.

The graded return process is meant to be useful and visible: unboxing/review, rubric discussion, engraving, powder coat, a finished follow-up clip, and return to the participant. If the result passes and publication is authorized, it can also join the live leaderboard.

FabChallenge FC logoWHAT DOES GRADING MEAN?

Official FabChallenge grading evaluates your completed project, not a professional certification.

Compare graded kits →
THE FABCHALLENGE LEADERBOARD

Your next build could earn a place on the board.

Graded projects that meet the passing standard may be featured on the public leaderboard with the participant's permission. It is recognition for completing the FabChallenge—not a welding certification.

Important: FabChallenge is not an accreditation, certification, code qualification, or hiring guarantee. A passing result documents successful completion of this specific project to the FabChallenge standard.
KEEP SNOOPING

One question usually leads to another.

Compare the packages, read the grading standard, see the leaderboard, or ask us directly. The entire FabChallenge section is built so you can jump around without losing your place.